Kellog Plant

This is picture 1

LOCATION Battle Creek, MI
SQUARE FOOTAGE NA
DOLLAR VALUE $5 Million
DELIVERY METHOD Competitive Bid
A/E FIRM NA
MAJOR SUBS NA

 

The interior walls of nine existing adjacent suites were demolished to create one large open area luxury suite. The Champion's Club has all of the amenities of the individual suites - a fully stocked bar, buffet tables, indoor and outdoor seating for the event and private restrooms.

The Champion's Club can seat up to 114 people and provides an executive atmosphere: unique glass and marble tile, leather seating, trophy and memorabilia display areas, artwork and plasma screen TV's. Patrons can enjoy the high-end service of a suite at a fraction of the cost of an entire suite.


Industrial Construction Portfolio

 

Ideal Contracting has a strong presence in Industrial Construction market with completion of projects for clients such as: DTE, Johnson Controls, Detroit Diesel and Vitech Industries.  Ideal continues to provide excellence in general contracting for projects of many types including press pits, manufacturing facility expansions, miscellaneous steel installation and concrete work.  Ideal’s services vary with the needs and requirements of the owners but inevitably we forge a strong relationship within the project team and owners to produce an end product that is desired.

Detroit Deisel - Exterior Façade Renovation

LOCATION Redford, Michigan
SQUARE FOOTAGE 12,000
DOLLAR VALUE $235,000
DELIVERY METHOD Competitive Bid
A/E FIRM HarleyEllis
MAJOR SUBS Moore Flame

 

Large cantilever tubular structural members were erected to form a unique looking main entrance. Ideal Contracting furnished and installed the steel using its self-perform division.

The steel was erected using additional cranes to hold the cantilever section of steel in the air while the other crane serviced the iron workers with the fill-in steel members. The job was completed with safety as our number one priority.


John E. Green - Marathon Ashland
LOCATION Detroit, MI
SQUARE FOOTAGE 280,000
DELIVERY METHOD Competitive Bid

 

Ideal Contracting's Iron Workers installed owner furnished prefabricated structural steel for a new pipe support system. The project required close interface with the Ashland Marathon Project Manager coordinating the logistics of daily field activities including safety and coordinating with multiple contractors working in the same small area.

Ideal Contracting stepped up to the challenge and not only successfully met but exceeded the stringent safety requirements of a petroleum facility.


VITEC - Building Addition
na
LOCATION Detroit, MI
SQUARE FOOTAGE 2,400
DOLLAR VALUE $280,000
DELIVERY METHOD Competitive Bid
A/E Firm FES
MAJOR SUBS J. J. Barney, Ideal Steel, Exterior Metals, Masonry Alterations, Simon Watt, Detroit Door & Hardware

 

A building addition was needed to house operation for grinding excess plastic and recycling. A separate area was needed for gas tanks.

The project included the addition of 3 overhead doors and 8" concrete slab. Ideal Contracting self-performed steel, roofing and siding work.