| LOCATION | Battle Creek, MI |
| SQUARE FOOTAGE | NA |
| DOLLAR VALUE | $5 Million |
| DELIVERY METHOD | Competitive Bid |
| A/E FIRM | NA |
| MAJOR SUBS | NA |
The interior walls of nine existing adjacent suites were demolished to create one large open area luxury suite. The Champion's Club has all of the amenities of the individual suites - a fully stocked bar, buffet tables, indoor and outdoor seating for the event and private restrooms.
The Champion's Club can seat up to 114 people and provides an executive atmosphere: unique glass and marble tile, leather seating, trophy and memorabilia display areas, artwork and plasma screen TV's. Patrons can enjoy the high-end service of a suite at a fraction of the cost of an entire suite.
Automotive Construction Portfolio
With Automotive clients such as General Motors, Ford Motor Company, DaimlerChrysler, and Hyundai we continue to be a recognized construction leader in the automotive sector.
Our success in the Automotive Market has led Ideal Contracting into projects utilizing 3D Building Information Modeling (BIM), an intelligent model that uses math data to support the construction process with a project delivery method using “lean methodologies”; Faster, Better, Cost Effective and Safer. To date Ideal Contracting has completed 3 projects using this Lean method of construction and is currently working on another project in Toledo, Ohio where we continue to achieve results through hard work, creative problem solving and excellence to meet the needs of the automotive sector.
![]()

Ford Motor Company -
Test Track

General Motors -
Sequencing Facility

General Motors -
16 Bay Addition

General Motors -
Replace Floor Slab

General Motors -
Engineering Building

General Motors -
Flint V6 Engine Plant

| LOCATION | Dearborn, Michigan |
| DOLLAR VALUE | $250,000 |
| DELIVERY METHOD | Competitive Bid |
| MAJOR SUBS | Hydraulic, Ferndale Electric, Flynn Paving, Industrial Fence, Barton Malow Concrete |
Set temporary measure for access to future largest paving project in Michigan. Project includes creating new truck traffic access, temporary fencing, new power to future construction trailer city, and new guard shack

| LOCATION | Fort Wayne, Indiana |
| SQUARE FOOTAGE | 284,000 |
| DOLLAR VALUE | $27 Million |
| DELIVERY METHOD | Design Build |
| A/E Firm | Ghafari Associates |
| MAJOR SUBS | Superior Electric, John E. Green, Kreager Brothers, Barton Malow Concrete, Douglas Steel, and Shambaugh & Son |
This project was a collaborative effort with Owner, Architect\Engineer, equipment process team, and subcontractors utilizing the 3D BIM and Lean Construction Process.
The project was completed 2 months early with value engineered savings of over $3,000,000. In coordination with our collaborative team it was determined that an access road was required to maintain plant operations during construction. This building consisted of a warehouse, sequencing facility, restrooms and 17 loading docks.

| LOCATION | Pontiac, MI |
| SQUARE FOOTAGE | 39,600 |
| DOLLAR VALUE | $5.3 Million |
| DELIVERY METHOD | Design Build |
| A/E Firm | Ghafari Associates & Barton Malow |
| MAJOR SUBS | Superior Electric, John E. Green, Eagle Excavating, Shambaugh & Son, Douglas Steel, Barton Malow Concrete |
This project was a collaborative effort with Owner, Architect\Engineer, equipment process team, and subcontractors utilizing the 3D BIM and Lean Construction Process.
The project was completed 1 month early with value engineered savings of over $400,000.
The use of 3D BIM modeling and regular design meetings kept the project proceeding smoothly without the fear of costly utility interferences. This building consisted of a sequencing center.

| LOCATION | Warren, MI |
| SQUARE FOOTAGE | 70,000 |
| DOLLAR VALUE | $1.13 Million |
| DELIVERY METHOD | Competitive Bid |
| A/E Firm | Giffels |
| MAJOR SUBS | Self Perform |
Ideal Contracting self-performed the removal and replacement of approximately 70,000 sf of existing floor slab. By utilizing a laser screed, the project was completed in four (4) major pours. Three new filter decks and associated ramps were also installed.
This work was completed without interruption to plant production. The new 12" steel fiber reinforced slab will be used to support the equipment that will produce the new 6-speed transmissions.

| LOCATION | Pontiac, MI |
| SQUARE FOOTAGE | 430,000 |
| DOLLAR VALUE | $52 Million |
| DELIVERY METHOD | Design Build |
| A/E Firm | Barton Malow Design |
| MAJOR SUBS | Limbach, Superior Electric, Ideal Steel and Barton Malow Concrete |
This project was a 4-story office building that included executive offices, test facilities for engines and a fully functioning cafeteria.
This building is the main entrance to the Powertrain campus. We were able to complete this project 3 months ahead of schedule using a lean construction method that we have continued to develop.

| LOCATION | Flint, MI |
| SQUARE FOOTAGE | 416,000 |
| DOLLAR VALUE | $53 Million |
| DELIVERY METHOD | Design Build |
| A/E Firm | Ghafari Associates, LLC & Barton Malow |
| MAJOR SUBS | Superior Electric, John E. Green, Douglas Steel, Barton Malow Concrete, Eagle Excavation |
This project was a collaborative effort with the owner, Architect\Engineer, equipment process team, and subcontractors utilizing the 3D BIM and Lean Construction Process.
The project was completed 3 months early with value engineered savings of over $5,000,000. This is a manufacturing facility for the new Global V6 Engine, which included team rooms, restrooms, locker room, utility loop for process equipment, cafeteria and conference rooms.

When you choose to enter our prequal room you will leave this site to a 3rd party prequal form.