GENERAL MOTORS CORPORATION
Flint V6 Engine Expansion

LOCATION: Flint, Michigan
SQUARE FOOTAGE: 416,000
DOLLAR VALUE:
$53 Million
DELIVERY METHOD:
Design Build
A/E FIRM: Ghafari Associates, LLC & Barton Malow
MAJOR SUBS: Superior Electric, John E. Green, Douglas Steel, Barton Malow Concrete, Eagle Excavation

This project was a collaborative effort with the owner, Architect\Engineer, equipment process team, and subcontractors utilizing the 3D BIM and Lean Construction Process.  The project was completed 3 months early with value engineered savings of over $5,000,000.  This is a manufacturing facility for the new Global V6 Engine, which included team rooms, restrooms, locker room, utility loop for process equipment, cafeteria and conference rooms.